Thursday, August 5, 2010

Double Oven Cutout Email

Arnold-

I've attached copy of the double oven specs which include a diagram (the cutout specs are what's relevant). Currently we have about 54 or 55 inches vertically and 27" horizontally. What we want is 60-3/4" vertically and only 25-1/2" horizontally. If you look at the attached pictures, this means the two horizontal bars need to be removed, the top one should be moved somewhere close to the top of the tape measure , the two cabinet doors will probably need to be replaced with smaller ones, and a couple small filler pieces will be needed to shorten the width (current opening is 27" wide, we want 25.5").

Finally, the installer said we're missing a 3/8" valve under the sink for the dishwasher and we need that before they can install that appliance. He also said to make sure there is a "3" return on dishwasher opening to mount dish."

Abt is still coming next Thursday to do the installation. I'm going to be at my parents place Mon and Tues next week, if we can get this stuff in place, and finish up the fireplace/wall by Monday evening, I can schedule the inspection for Tuesday. Let me know if you think that time line works and I'll call them to schedule it.

Thanks,
Pratik



Also, he's now hoping to install the counter tops on Saturday.

Wednesday, August 4, 2010

Punch List

I spoke to Arnold today. Unfortunately, the counter tops won't be installed until tomorrow. For reasons I can't explain, he said he never received my email yesterday. That email had a punch list of items that still required their attention. He didn't send Arthur to the house today because he didn't think there was more than a quarter days worth of work left. Obviously that's very wrong. I resent the email with the items listed below.

He also complained that the island light he agreed to install was supposed to be a simple fixture, not something that required a half days time. I get what he's saying, but honestly I think Arthur made it more complicated than it should have been. When I came home that day during lunch, he was confused because he though boxes for the island light and the boxes for the dining room light were all for one light fixture- the one for the island. That's what caused the delay. I didn't mention that to Arnold but I will if it becomes an issue. Anyway, here's the punch list:
  1. Tile in the corner of the bathroom, under the sink, doesn't reach all the way to the trim so there's a visible gap. If we can fill that in with grout I think it would look fine.
  2. During demotion the round decorative base at the bottom of the foyer stairway was cracked/chipped. If someone can just patch the chip and repaint it, I think it'll be okay.
  3. Drywall from the basement ceiling chipped off because of the force of the nail gun when installing the floors. If someone can patch that up.
  4. Some damage was done to the ceiling in the garage. I can't be more descriptive because I'm not sure what this is, but my mom said she talked to you about it back when it happened
  5. Screen door frame was damaged by being stretched open too far. My mom said you guys spoke about this as well.
  6. One pantry door was damaged during cabinet installation
  7. According to my mom, two small garbage cans, sized to fit the roll-out garbage cabinet, were supposed to be supplied with the cabinet
  8. Cabinet soft close is installed in some but not all cabinets
  9. Since the electrical was installed for the can lights, the lights outside the garage door keep blowing out. Seems like there are periodic surges blowing out those bulbs- we swapped them out three times (6 total bulbs) before we stopped. Martin said he'd take a look but I guess he hasn't done that yet.
  10. The roll-out trays in the base and pantry cabinets still need to be installed
  11. I realize the fireplace is still a work in process, but I wanted to remind you that the mantle was going to be installed in a special way to make the tiles look uniform. (If Arthur wasn't aware of this and to do it would require demolishing what's been done and starting over, give me a call. I don't think the mantle looks terrible, but will have to talk to the family to see what they think.)
  12. Carpet is still hanging loose in foyer and the basement
  13. Air Conditioning vent under the kitchen sink was closed off when Arthur installed the toe kick. That should be cut open so the heat/cold air can get out.
  14. Dining room light still needs to be installed. This light shouldn't be too complex. In fact, before we ordered the island light we spoke to Martin and even though we preferred pendant lights each with their own transformer, he said get the kind with one transformer and a line because that's what we're setup to install. I understand that installing the line was a little more work but can't imagine it took half the day. Obviously I'm not an electrician but take a look at the light and let me know what you think (it's literally one transformer with a wire connected to it). Also, to be fair, we only bought what Martin told us would work, we're not trying to sneak one in on anyone. If we were, we wouldn't have told him what we we wanted to order before doing so nor would we have requested his input on what would work. In any event, the dining room light is just a more modern chandelier like was there previously, I imagine it wouldn't require as much attention as the pendants.
  15. Some trim still needs painting
  16. Bathroom mirror needs to be installed
As far as I can tell, these items along with the fireplace, remaining can lights, and back splash are all that remain. Shoot me an email or a text so I know you received this- I'm not sure why you didn't get yesterday's email.

Monday, August 2, 2010

Week 7

Floors will be buffed and finished today. Mom went to Bensonville this morning to look at the granite scrap for the island counter top- she liked it a lot, and we've arleady told Arnold to use it. All of the counter tops, including hopefully the island, will be installed on Wednesday/Thursday. Sadly, Abt can't come in to install the appliances until next Thursday. This means we'll basically have another week of downtime. Hopefully we can get the back splash mostly installed and the other items finished up before Abt shows up.

Friday, July 30, 2010

Timeline

Arthur's been working on the cabinet trim today. I had a busy day at work so i couldn't spend much time in the house, I only stopped by to make sure someone was there.

Arnold called me and left a message asking about the size of the cooktop. I forwarded him the product information. He said he anticipates a Wednesday/Thursday installation for the countertops and said we could schedule a Friday install with Abt. He went on to say that Arthur will install the soft close fixtures for the cabinets and work on patching up the drywall around the fireplace today and he expects everything but the floors and the backsplash to be finished by next week. Finally, by Tuesday/Wednesday of the following week he expects the project to be complete.

Thursday, July 29, 2010

Day Nine Thousand

No car today so no lunch time pictures. But it doesn't really matter, I don't think anyone came to the house today...again. I did get a call from Arnold around lunch time because the girls from the stone company couldn't get in the house to measure the countertops. Apparently someone accidentally locked the inside door. Again, I had no car, so I just gave him our garage door code. We can always change it if we need too.

Arnold also told me he'll be sending some guys over tomorrow to hopefully wrap up most, if not all, of the remaining items. I think them finishing everything is a bit ambitious but I also think Arnold wants to ask for another check but is hesitant because he knows we're frustrated with the speed at which the project is moving. With that in mind, money is good motivation, so maybe for that reason he sends the cavalry tomorrow. We'll see.

Tuesday, July 27, 2010

Fireplace

Not much to post. They sanded the floors yesterday and will varnish/buff them today. I'll try to take pictures tonight but I don't think that sort of thing is recognizable via photograph.

Late last week they finished the fireplace. Here are a couple pictures:


Friday, July 23, 2010